Fibermesh.com
Contact Us | Search Site:

 

 

Application Sheets

CHANNEL TUNNEL RAIL LINK - UK (CONTRACT 250)
This L 130m project is part of the Channel Tunnel Rail Link (CTRL) high-speed rail llink which runs for 108km between the Channel Tunnel adn central London. The project has over 40km or 7.15m diameter, precast concrete lined bored tunnels, sections which are cnstructed in water bearing sand. Fibermesh 150 fibers at a dosage of 1kg/m3 were used in teh production of the precast tunnel lining segments which also included Novocon steel fibers in a total fiber-reinforced solution.